Friday, May 8, 2015

May 11-15

1st Period

Monday: Juniors Pre-ACT activities
Tuesday: Juniors will be taking the ACT
Wednesday-Friday: Take care of chicks (feed, water, proper temperature)
Avian Digestion System
Powerpoint and Guided notes

2nd Period
Monday-Friday:

Name:________________
Wetlands Road Construction Project
Description: You will be researching road construction designs and techniques. You will then write a report and build a scale model of a 4 lane highway to be built across a wetland.  You should construct the roadway in a manner that creates minimal damage to the wetland. Keep in mind factors such as: cost, construction materials, soil erosion, habitat destruction, affects on wildlife, etc.
1.)  You will first write a report describing how you will build the roadway

2.)  Next you will construct a model 4 lane highway that will be built across a wetland.

Requirements for Report:
·       Describe the design and technique of the roadway you will build
·       Describe how you will minimize damage to the wetland
·       Include a budget of how much it will cost to construct the roadway
·       Include materials needed to construct roadway (as if it were an actual roadway)
·       Describe how you will minimize soil erosion, habitat destruction and negative effects on wildlife
·       Any other important information you think should be included in the report
·       Should be at least 1 page, 12 pt font, typed. But must have ALL of the requirements listed above

Requirements for Model:
·       Can use materials from school or can bring materials from home
·       Must have a drawing of the wetland underneath/around/through the roadway

·       Model should show how you are planning on minimizing destruction of wetland

3rd Period
Monday: Study for upcoming tests/quizzes and work on homework
Tuesday: Students will be gone for the 7th grade Science Field Trip 
Wednesday: Study for Spelling Test 
Thursday: Study for Spelling Test 
Friday: Work on homework 

4th Period
Monday-Friday:
 Horseshoe projects, maintenance of tomato plants 

5th Period
Monday-Friday: 
Students are fabricating gate latches for a local ranch

7th Period
Monday: Take chicks to Preschool and present educational poster
Tuesday-Friday: Careers in Forestry Project



No comments:

Post a Comment