Animal Science: 4th Period
Tuesday: Finish presenting Livestock Breeds PowerPoint
Begin Swine Unit
Prep for getting chickens
Thursday: Swine Unit
Welding I: 7th Period
Tuesday: Go over Chapter 29
Welding Symbols and Blueprints (PowerPoint and guided notes)
Thursday: Symbols practice worksheets
Safety rules
Oxy-Acetylene equipment and set up
Floriculture: 1st Period
Wednesday: Finish and Present History of Floral Design Posters
Begin reviewing chapter 6 (answer questions 1-15 if time)
Friday: Focal Point activity
Color Harmony activity
Begin color wheel if time
Greenhouse Management: 2nd Period
Wednesday: Finish Bulletin boards (Harvest of the month, ag and shop board)
Water school garden
Begin fixing greenhouse
Friday: Greenhouse Structures
We will review the different structures (PowerPoint with guided notes)
Students will work in teams to create a model of their choice of structure
Ideal Greenhouse
We have discussed the major points of locating, designing,
and operating a greenhouse structure.
You now need to make a diagram/ drawing/ or model of your ideal
greenhouse.
The following considerations must be incorporated into the
drawing and then discussed in a paper that explains the design.
1. Location: where and why is it located there. Remember to think about latitude and
longitude, topography, climate, light intensity etc.
2. Zoning: In relation to you local position where are
you? (residential, commercial, industrial, urban vs. rural etc.)
3. Water system: What drain and water
supply do you have? Where is it located,
how is it provided to plants?
4. Greenhouse type: Quonset, Gothic Arch,
Connected, Even Span, etc.
5. Greenhouse covering: Polyethelyne,
lexan, FRP, Glass ……
6. Heat system: Fuel used, heater type,
location, thermostats, fog heat, steam, hot water, etc.
7. Business type: Research, retail,
wholesale, personal use ….
8. Cooling system: Vents, evaporative
cooling pads, fans, air conditioners, shade cloths etc. …
9. Circulation system: Keep the air moving and evenly cooled/heated.
10. Lights:
Do you need any? What type,
where located?
11. Internal setup: Table locations, use of
space etc.
12. Access:
Roads, Parking, Utilities etc.
Has anything important
been forgotten???
Explain the situation in which you choose to operate your
greenhouse and then design it for that situation. Make sure to consider all 12 factors listed
above. Think about how each will affect
the others. Design for me the most
ideal greenhouse for your situation.
GRADING
1:
Model/Drawing/Diagram: 36 points
2 pts each factor
graded upon its detail and practicality of fitting with situation and
demonstration of knowledge of unit material.
12 points for quality of
the work.
2: Written Explanation: 48 points
36 points Each
factor is explained. In the explanation
each factor is discussed in detail (why, how, in what way it affects other
factors, cost, etc.)
12 points Writing ability. Sentence structure, grammar, punctuation, etc.
Advanced Welding: 5th Period
Wednesday: Safety Rules
Review GMAW and SMAW
Friday: Take safety tests
Begin practice welding (oxy-acetylene, GMAW and SMAW)
Junior High Ag: 6th Period
Wednesday: Intro to Ag (PowerPoint and Guided notes)
Ag Walk (identify products around the school campus and where they came from)
Friday: 7th Grade: Livestock Poster
8th Grade: Wildlife Poster
No comments:
Post a Comment